Scrum vs Kanban vs Waterfall vs Hybrid
Compare Scrum, Kanban, Waterfall, Scrumban, and Shape Up for small engineering teams—cadence, roles, artifacts, overhead, and a practical decision guide.
TL;DR
Pick Kanban for continuous ops, maintenance, or a 1–3 person team working with AI agents. Pick Scrum when a 4–9 person team needs a predictable sprint cadence for stakeholder demos. Pick Shape Up for 6-week product bets, and Waterfall only when regulations or hardware lock requirements upfront.
Why it exists
Teams often copy enterprise ceremonies—daily standups for one developer, two-week sprint planning for an ops queue, or 40-page Waterfall specs for an exploratory product. Matching the delivery model to requirement stability, team size, and interrupt rate removes ceremony without losing predictability.
Comparison table
| Dimension | Waterfall | Scrum (2020 Guide) | Kanban | Scrumban (Hybrid) | Shape Up (Basecamp) |
|---|---|---|---|---|---|
| Cadence | Sequential phases (requirements → design → build → test → deploy) | Fixed-length Sprints (1–4 weeks, commonly 2 weeks) | Continuous flow, no required timeboxes | Continuous flow + optional planning/retro cadence | 6-week build cycles + 2-week cooldown |
| Roles | Project manager, analysts, devs, QA (often siloed) | Product Owner, Scrum Master, Developers | No prescribed new roles; team owns the board | Existing team; optional rotating coordinator | Shapers (senior product/tech), small build teams (1–3) |
| Artifacts | Big upfront spec, Gantt schedule, sign-off gates | Product Backlog, Sprint Backlog, Increment | Visual board, WIP limits, explicit flow policies | Kanban board + lightweight prioritized backlog | Shaped pitches, betting table, hill charts |
| Requirements | Fixed upfront; late changes are costly | Changing; re-prioritized every Sprint | Changing; reprioritized whenever a slot opens | Changing; handles both planned features and interrupts | Fixed appetite (time), variable scope |
| Best team size | Large / multi-vendor regulated projects | 4–10 people (Scrum Guide recommends ≤ 10) | 1–12 people (great for 1–3) | 2–8 people | Small autonomous squads (2–3 per bet) |
| Overhead | High (upfront docs & phase gates) | Medium (4 events per Sprint) | Low (board + WIP limits) | Low–Medium | Low–Medium (upfront shaping, then autonomous) |
Decision guide
- Choose Kanban if you are a solo developer, a 1–3 person team, or an ops/platform team handling unpredictable support and bugs alongside feature work.
- Choose Scrumban if you like Kanban's pull flow and WIP limits, but still want a weekly planning check-in and a biweekly retrospective.
- Choose Scrum if you have 4–9 people, a dedicated Product Owner, and stakeholders who expect a working demo every 2 weeks.
- Choose Shape Up if 2-week sprints feel like a hamster wheel and you want 6 weeks of uninterrupted focus where scope flexes to hit the deadline.
- Choose Waterfall only when external certification, hardware manufacturing, or fixed-bid contracts forbid iterative scope changes (even Royce's 1970 paper noted that pure non-iterative waterfall is risky without feedback loops).
Minimum viable version (1–3 person team + AI agents)
Use a 3-column Kanban board (Ready → In Progress (WIP: 2) → Done) plus a weekly 20-minute review:
- Keep
Readycapped at 5–7 small, well-scoped tasks so AI agents or teammates can pick up work without ambiguity. - Enforce WIP ≤ 2 on
In Progress—finish and merge one PR before starting another. - Skip daily standups if you already communicate asynchronously in PRs and commit logs.
When it's overkill
- Running 2-week Scrum ceremonies (Sprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective) for a 1-person project—you end up scheduling meetings with yourself.
- Writing a multi-month Waterfall specification for a startup MVP where user feedback will invalidate half the assumptions in week one.
- Creating a Jira workflow with 11 statuses and mandatory story-point estimation when 10–15 lines in a markdown backlog would do.
Gotchas
- Cargo-cult Scrum: Calling a weekly status meeting a "Sprint" while dumping unplanned mid-sprint requests onto the team gives you all the ceremony of Scrum with none of the focus.
- Kanban without WIP limits: A board with no WIP limit is just a sticky-note graveyard; work piles up in
In Progressand nothing ships. - Misreading Royce (1970): Winston Royce's paper is often cited as the origin of Waterfall, yet he explicitly warned that running the sequence once without iteration is "risky and invites failure."
Production checklist
- Every active task has one clear owner and lives on a single visible board.
-
In Progresshas an explicit WIP limit (for example,WIP ≤ 2for a solo dev oragents + 1). - The team agrees on when scope can change (anytime in Kanban vs next Sprint in Scrum).
- There is a lightweight weekly or biweekly pause to inspect what shipped and drop what isn't working.
Check yourself
Check Yourself
1. A 2-person team builds an internal developer tool while also handling daily production support tickets. Which model fits best?
2. In Basecamp's Shape Up, what stays fixed and what flexes during a 6-week cycle?
Sources
Related Notes
Software Supply Chain Security
Securing dependencies and CI/CD pipelines with lockfiles, SHA-pinned GitHub Actions (with this repo as an honest example), pnpm audit, Renovate/Dependabot, SBOMs, and SLSA provenance.
Idea to Production Lifecycle
Trace how software moves from discovery and PRD through design, threat modeling, build, CI/CD, release, monitoring, and retro—sized for small teams.