Leadership

Decision-Making for Engineering Leads

How to make timely, evidence-based decisions using DACI/RACI ownership, reversible vs irreversible trade-offs, and lightweight decision logs.

how-tointermediateTested with atlassian_daci Atlassian Team Playbook (DACI)Updated Nov 27, 2026

TL;DR

Good engineering decisions are timely, evidence-based, and owned by one Approver. Push reversible choices down to the engineer closest to the work, reserve ADRs and DACI for hard-to-reverse choices, and always separate facts from assumptions before picking an option.

Why it exists

Teams stall in two opposite ways: analysis paralysis (everyone debates for three weeks because nobody knows who the single Approver is) or unrecorded gut calls (six months later nobody remembers why a risky database or vendor choice was made).

Mental model: DACI + Reversibility

Atlassian's DACI framework prevents committee gridlock:

  • Driver (D): Moves the decision forward—collects facts, drafts options, sets the deadline.
  • Approver (A): One person with final sign-off authority.
  • Contributors (C): Subject-matter experts (Security, Ops, QA, Product) whose input shapes the options.
  • Informed (I): Stakeholders notified once the decision is made.

Pair DACI with reversibility: if a choice is easy to undo (e.g., an internal helper module), let the responsible developer decide in a PR. If it is costly to undo (e.g., public API contract, auth model, database engine), write a short ADR (process/adr).

Do it: 8-step decision process

  1. Frame the problem & outcome: What must be true after this decision?
  2. Separate facts from assumptions: List verified metrics/constraints separately from guesses.
  3. List hard constraints: Budget, deadline, compliance, latency, team skills.
  4. Draft 2–3 real options: Include "do nothing / defer" when relevant.
  5. Compare trade-offs: Value, delivery time, operational cost, risk, maintainability, and reversibility.
  6. Consult only essential experts: Keep Contributors small (process/raci).
  7. Assign one Approver and decide: Pick an owner and set a decision deadline.
  8. Log and revisit: Document in an ADR/ticket with a metric and review date.

Compact decision record template

# Decision: [Short Title]

## Context & Constraints
What problem are we solving, and what deadlines or limits apply?

## Facts vs Assumptions
- **Fact:** Current p95 query latency is 1.8s at 2k req/min.
- **Assumption:** Adding a read replica cuts p95 under 300ms.

## Options
1. **Option A (Read replica):** Fast to ship (2 days); adds replica lag handling.
2. **Option B (Redis cache):** Sub-50ms reads; requires cache invalidation rules.

## Decision & Ownership (DACI)
- **Driver:** @backend-dev · **Approver:** @team-lead
- **Contributors:** @ops, @qa · **Informed:** @pm
- **Chosen:** Option A, with a 2-week latency review.

Gotchas

  • Multiple Approvers: Two Approvers means neither owns the risk and the decision stalls.
  • Treating assumptions as facts: Validating a 2-day spike assumption before committing saves weeks of rework.
  • Escalating everything (or nothing): Push local implementation choices down; escalate budget, customer commitments, legal exposure, and cross-team architecture.

Production checklist

  • Hard-to-reverse technical decisions have a written ADR (process/adr) with ≥ 2 options.
  • Every major decision names one Approver and a decision deadline.
  • Unvalidated assumptions are flagged for a time-boxed spike before full build.
  • Decisions include a follow-up metric or review date to verify the outcome.

Check yourself

Check Yourself

1. In the DACI framework, what happens if a decision has three Approvers listed?

2. When should a Team Lead push a technical decision down to the implementing engineer instead of requiring a DACI review?

Sources